The AZCO crane arrives at the light station on the morning
of April 22, 2002. The scaffolding is in place for the workers and
the tower components are being uncrated.
Tower components being uncrated
The crane operator starts lifting the first component of
the tower
The lift begins!
Up and over the scaffolding, where the craftsmen from
Luxembourg await!
The bottom section is carefully lowered into place...
It fits like a glove! Once in place, the tower
bottom is bolted to the existing posts in the light station attic.
The next component, the two-piece walkway, is assembled
prior to being lifted. Railings between the two sections are
attached...
...and the copper deck material is carefully joined.
Up it goes!
The platform being lifted. Balance was perfect, the
unit lifted beautifully using two straps.
The workers get ready to guide the platform to its final
position.
The platform clears the scaffolding.
The carpenters rotate the platform into position.
Lining up the platform with the lower box. This was
a tight fit due to the precision craftsmanship, performed in Luxembourg.
The walkway platform settles perfectly into place!